Insured & bonded · Women-owned & family-run · Serving DFW since 2018 Call or text (940) 281-0006 Mon–Fri 9am–6pm · Sat 10am–2pm

Home / Services / Bathroom Remodeling

Bathroom Remodeling in Plano & Dallas–Fort Worth

From a dated tub and tile floor to a walk-in shower you’ll love every morning. We handle demolition, waterproofing, tile, glass, vanities and fixtures, and you see the progress every day in your project updates.

Prefer to text? Text photos of your project to (940) 281-0006 and we’ll reply with next steps.

  • Insured & bonded
  • Serving DFW since 2018
  • Daily project updates
Walk-in shower with marble-look tile, pebble floor, niche and sliding glass door after a bathroom remodel in DFW
What we do

What’s included in a bathroom remodel

Primary bathrooms, hall baths, guest baths and half baths. Full remodels or targeted updates.

  • Tub-to-shower conversions and walk-in showers
  • Demolition down to the studs when needed
  • Waterproofing behind every tiled wet area
  • Wall, floor and shower-pan tile, including niches and benches
  • Frameless and sliding glass shower doors
  • Vanities, countertops, sinks and mirrors
  • Freestanding tubs and soaking tubs
  • Shower valves and fixtures (licensed plumber)
  • Lighting and exhaust fans (licensed electrician)
  • Drywall, paint, trim and accessories
Bathroom Remodeling in Plano & DFW

Small changes can make a big difference

Many DFW bathrooms still have the original builder tub, a cultured-marble vanity and a small tile floor. Turning that tub into a walk-in shower with a niche and frameless glass is one of the most popular projects we do, and it makes a bathroom feel bigger and easier to use.

The part you never see matters most. Behind every tiled shower we install a waterproofing system before any tile goes up, and we photograph the rough-in and waterproofing stages so you can see what’s inside your walls. Shower valves and drains are installed by licensed plumbers.

You’ll get a written proposal with the scope and price before we start, and design help choosing tile, glass and fixtures once you hire us. During the remodel you get an update every day we’re on the job, so you’re never wondering when the tile goes in or the glass arrives.

Our work

Bathrooms we’ve remodeled

Real projects by our crew in DFW homes and businesses.

After: Tub-to-shower conversion, 2026
Before: Tub-to-shower conversion, 2026
BeforeAfter
Tub-to-shower conversion, 2026
After: New tile floor, same bathroom
Before: New tile floor, same bathroom
BeforeAfter
New tile floor, same bathroom
How we keep you in the loop

You’ll never have to chase us for an update.

Most remodeling horror stories aren’t about the work. They’re about the silence: calls that go unanswered, a crew that doesn’t show and no idea what happens next. We built Remodeling Texas Homes to be the opposite. Every job runs through our own project tracking system, and every day we’re working on your home, you get an update.

Our promise: a status update every day we’re on your job, at every stage.

  • On-the-way textsA text when our crew is headed to your home, so you’re never left waiting.
  • Updates at every stageDemo, rough-in, tile, paint, final walkthrough: you hear about it the day it’s done.
  • Progress photosSee your project move forward from work or out of town.
  • Call for a status anytimeCall our main number. Our system recognizes you and tells you today’s progress and what’s next on the schedule.
  • Paperwork on your phoneEstimates, contracts and invoices are sent to you automatically, with secure payment links.
How it works

Three simple steps to a finished project

  1. 1

    Free consultation

    Call, text or send the estimate form. We visit your home, measure, listen to what you want and talk through options and budget.

  2. 2

    Clear written proposal

    You get a written scope, price and schedule. If anything changes later, it goes in a written change order before we do it. No surprises.

  3. 3

    We build, you stay informed

    Our crew does the work with daily updates and photos, then we walk the finished job with you before we call it done.

FAQ

Bathroom Remodeling questions

How long does a bathroom remodel take?

Most hall and guest bathrooms take 2 to 4 weeks. A primary bathroom with a walk-in shower, new layout and custom glass usually takes 4 to 6 weeks. Glass doors are measured after tile is done, which adds about a week.

Can you convert my tub into a walk-in shower?

Yes. It’s one of our most common projects. We remove the tub, rework the drain and valve, waterproof the area and build a tiled shower with a niche, bench or glass door.

How do you prevent leaks?

Every tiled shower gets a waterproofing system on the walls and pan before tile goes on, and the plumbing is done by a licensed plumber. We photograph each stage so you can see it.

Do you remodel half baths and small bathrooms?

Yes. Powder rooms and half baths are a great place to add a new vanity, mirror, lighting and flooring in a few days.

What do I need to choose?

Tile, vanity, countertop, fixtures and glass. Once you hire us we help you pick them and give you supplier recommendations, so you’re not doing it alone.

Ready to start your project?

Tell us what you have in mind. We’ll set up a free consultation and send you a clear, written estimate.

Call TextEstimate